Your sustainability data arrives minus the two weeks of spreadsheets
Your waste data files its own evidence all year — photos, weights, signatures. When the auditor asks, you export. The formatting is already done.
Your data builds itself all year.
Evidence accrues with every pickup. By reporting season the data already exists — you export it.
Everything ESG reporting in Malaysia asks of you.
Regulators, investors, and auditors each ask differently. One verified dataset answers them all — no separate spreadsheet per framework.
Every line traces to live pickup records in GarGeon Connect — the same system that runs your collections day to day.
See digital waste managementMONTHLY · QUARTERLY · ON DEMAND
Reporting season comes down to three steps.
No data entry. No vendor switch. The work happens at the bin — you just export the report.
Connect
We connect your sites, vendors, and pickup schedule once. Your current vendors stay.
48 hrs to first exportAccrue
Every pickup logs photo, weight, time, and signature. Evidence builds all year, automatically.
100% photo-backedExport
Pick the framework and the period. Your data exports in minutes, formatted and ready.
Audit-ready formatYour data is export-ready 48 hours after connecting. See a sample before you commit.
Book a ConsultationEvery quarter, a report like this one.
Not a dashboard screenshot and not a number without a source. Here is what lands in your inbox, section by section — including the parts that do not flatter us.
- 01Executive summary
Headline numbers with their month-by-month trend, so you can see direction before detail.
- 02A section per month
Every refuse chamber broken out — trips, tonnes, average per trip, and on-time rate against the schedule.
- 03Recycling by material
Carton, metal and the rest, with weights and trip counts kept separate from general waste.
- 04The diversion sum, written out
Not just the percentage — the division that produced it, so you can check the figure yourself.
- 05Trend charts
Tonnage by chamber, waste against recycling, and on-time rate over the period.
- 06Observations and what to check
Plain findings in plain language, including the ones that do not flatter us, and what we suggest you do about them.
From the GarGeon × Sunway Big Box Mall waste and recycling report, Q2 2026. Published with the client’s permission.
Common questions about ESG reporting in Malaysia
Accuracy, audits, vendors, and setup — what sustainability teams ask before they connect.

