Leighton brought five sites under one accountable contract.
Every site had its own waste collector, and the office had no live view.
Leighton Construction
Leighton Construction runs complex infrastructure projects across Malaysia, with several sites active at once.
Each site has to stay compliant and on schedule, and so does its waste.
- IndustryConstruction
- LocationJohor
- Scale5 sites
- Timeline8 weeks
- Services usedGarGeon Connect, Managing several vendors, Audit-ready ESG data, Recycling tracking
The problem, and what we did about it.
Multiple vendors
Coordinating a different collector at each site was complex and slowed the team down.
No digital tools
Scheduling, tracking and billing were not in any system. Nobody could see what was happening.
Manual reporting
Reports for management were made by hand. They were slow and easy to get wrong.
A recycling gap
Nobody knew which materials regional collectors would take. Recycling targets were hard to hit.
One contract covers every site
We brought the collectors into one service. Every project follows one process and gets one bill.
GarGeon Connect for the office
Scheduling, tracking and billing moved into one system. Each completed pickup is recorded as it happens.
Report-ready ESG data
Total waste, material mix and weights come out ready for ESG reports and audits.
Recycling first, with proof
We send recyclables away from landfill where we can. Then we report what each site recycled.
“We were spending more time managing waste vendors than managing construction progress. Every site had different processes, different vendors, and no visibility into what was actually happening with our waste.”
What changed in daily operations.
More time for the build
Managing waste is faster and simpler with one system.
Audit-ready records
GarGeon Connect keeps records of tonnage, pickups and billing for every site.
Decisions based on real numbers
Managers can see what is in the bins before they decide.
Higher recycling rates
More material is now recovered, which moves the projects towards their green goals.
Leighton now compares recycling rates across its five sites. Next, it aims to recycle more on every active project.
“GarGeon brought every construction site onto one accountable contract. We went from chasing multiple vendors with no visibility to one view, one invoice, and a 65% efficiency gain across our sites.”
Read how more Malaysian businesses run their waste with GarGeon.
They work in different industries on the same kind of contract. Each can show its results.

Audit-ready waste on the RM 3.7B Johor–Singapore rail link

Zero overflow across every property

