A RM 3.7B mega project keeps every pickup on the record.
The RTS Johor–Singapore link runs to strict deadlines and GBI standards. We made waste the part nobody had to chase — 95% on-time collection, and paper chits gone for good.
JB RTS Project
One of Malaysia’s largest construction companies, with a long record of delivering large-scale infrastructure. Here they are a key contractor on the historic RM 3.7 billion Rapid Transit System (RTS) Johor–Singapore Link.
On a build this size, the site has to hit tight deadlines and the waste-management standards that Green Building Index (GBI) certification demands. So the waste behind the work had to be just as accountable as the work itself.
- IndustryConstruction
- LocationJohor
- ScaleRM 3.7B project · RTS Johor–Singapore
- Timeline6 weeks
- UsingWaste collection service, Recycling programme
The problem, and what we did about it.
A sprawling vendor network
Disposal at this scale needed a large vendor network, which turned into complex multi-vendor management for the site team.
High volumes tracked on paper
The site generated enough waste for 50+ collection trips. Every one was logged by hand on paper chits, so tickets went missing or got lost.
No data for GBI
Existing vendors gave back no usable data, leaving the team without the numbers to support sustainability tracking or GBI reporting.
Hard to see performance
Across a site this large, there was no straightforward way to monitor how waste collection was actually performing.
Overflow from bad scheduling
When pickups slipped, waste piled up — disrupting site operations and the project’s progress.
No central system
The team needed one place to manage it all, with the efficiency and accountability a project this size requires.
One system ends the vendor juggling
We consolidated waste management under GarGeon Connect, so the team stopped coordinating a network of separate vendors.
Proof of every pickup
Each collection is logged with status, timestamps, who requested it, and proof-of-service photos — every pickup is auditable, with no paper chits.
Data ready for GBI
Detailed waste data now backs GBI submissions and the site’s own sustainability tracking, straight from the record.
Wood diverted from landfill
We route wood waste to recycling instead of landfill, supporting green construction practice on the build.
A dedicated operations partner
We coordinate the collection logistics and stay the single point of contact — keeping service on time and heading off overflow before it disrupts the site.
What changed on the ground.
Hours saved every week
No more manual chit handling means the admin work that used to eat the team’s time is simply gone.
Every trip on record
Each collection is captured with clear proof, so disputes and missing tickets stopped happening.
GBI data made easy
The data the site needs for GBI compliance and internal ESG tracking is ready when it’s asked for.
No more overflow
Scheduling now tracks the project workflow, so waste no longer backs up and stalls site operations.
More recycling and less landfill
Wood recycling cut what goes to landfill and turned waste back into reusable material on the build.
95% on-time pickups
Collection reliability climbed to 95% — the pickups happen when the site needs them.
On the RTS build the target is steady: GBI evidence kept current, and wood recovery pushed further with every phase.
“For a RM 3.7B mega project, waste compliance is critical. GarGeon gave us 95% on-time collection and audit-ready disposal records we can export in two clicks. Proving compliance is now straightforward.”